Advanced Search

Scaling Traditional CCAP To Meet The Capacity Needs Of The Next Decade
By John Ulm, Tom Cloonan, ARRIS, Inc.
2014
Network Migration to 1.8 GHz - Operational “Spectral Analysis” Measured in nano-Hertz, a 30-Year Perspective
By Zoran Maricevic, John Ulm, Craig Coogan; CommScope
2022
4096-OFDM Implementation on the HFC Plant with Fiber Deep and Distributed Access Architecture
By Maxwell Huang, Cisco Systems
2016
Managing the Coronavirus Bandwidth Surge: How to Cope with the Spikes and Long-term Growth
By John Ulm & Dr. Thomas Cloonan, CommScope
2020
Overlaying Mid-Band Spectrum Backhaul/Fronthaul onto HFC
By John Ulm, Dr. Martin Zimmerman, PhD, Stuart Eastman & Zoran Maricevic, PhD, CommScope
2021
HFC Improvement For DOCSIS 3.1 Evolution
By Maxwell Huang, Cisco Systems
2015
When Does the DOCSIS 3.1 TaFD Feature Increase the Capacity of My Network?
By Ayham Al-Banna, Ph.D. & Tom Cloonan, Ph.D., ARRIS
2017
Accelerating the Virtualization: Introducing Hybrid Fiber Shelf into the Mix
By Venk Mutalik, Bob Gaydos, Dan Rice & Jorge Salinger, Comcast
2020
Comcast Underground: Innovative Fiber Deployments Over Existing Underground Critical Infrastructure
By Venk Mutalik, Pat Wike, Doug Combs, Alan Gardiner, Dan Rice; Comcast
2022
Distributed Access Architecture Is Now Widely Distributed
By Dr. Robert Howald, Frank Eichenlaub & Adi Bonen, Comcast; Tobias Peck, EnerSys
2021
Operationalizing the Grey Optics Architecture
By Venk Mutalik, Dan Rice, Bob Gaydos, Doug Combs & Pat Wike, Comcast
2020
It’s ALIVE! Getting to Successful R-PHY Deployment: Do’s And Don’ts
By Tal Laufer & Jeroen Putzeys, ARRIS; Uffe Callesen, Stofa
2018
Multi-Wavelength Access Networks: A Practical Guide To Implementation
By Ray Thomas, Time Warner Cable and Venk Mutalik, C-COR
2007
Discussion of DOCSIS 3.1 Deployment Migration
By Carol Ansley, Jeff Howe, ARRIS Group, Inc.
2014
Closed Loop Capacity Optimization for Extended Spectrum DOCSIS
By Dr. Thushara Hewavithana, Intel Corporation; Dr. Rainer Strobel; Nader Foroughi, Shaw Communications Inc
2020
Optimizing the 10G Transition to Full-Duplex DOCSIS 4.0
By Richard S Prodan, Ph.D., Comcast Cable
2020
Maximizing the Capacity and Reliability of a DOCSIS Network
By Matthew Olfert, Shaw Communications
2019
Roaring into the ‘20s with 10G
By Dr. Robert Howald, Robert Thompson, Sebnem Ozer, Daniel Rice & Larry Wolcott, Comcast; Dr. Tom Cloonan, Dr. Ruth Cloonan & John Ulm, CommScope; Jan Ariesen, Technetix
2020
Blueprint for 3 GHz, 25 Gbps DOCSIS
By John T Chapman & Hang Jin, Cisco Systems; Thushara Hewavithana, Intel Corporation; Rainer Hillermeier, Qorvo
2019
Predictions On The Evolution Of Access Networks To The Year 2030 & Beyond
By Tom Cloonan (CTO-Network Solutions), Mike Emmendorfer (Sr. Director), John Ulm (Engineering Fellow), Ayham Al-Banna (Distinguished System Engineer), Santhana Chari (Sr. Director) , ARRIS
2014