Estimating Downstream Performance And DOCSIS 3.1 Capacity In CAA and DAA Systems
By Michael Emmendorfer, Brent Arnold, Zoran Maricevic, Frank O'Keeffe, and Venk Mutalik,
ARRIS
|
2015 |
Partnership For Extended Capacity: DOCSIS 3.1 With RFoG
By Venk Mutalik, Marcel Schemmann, Ayham Al-Bana, Zoran Maricevic, ARRIS Group
|
2014 |
The Yin And The Yang Of A Move To All Fiber: Transforming HFC To An All Fiber Network While Leveraging The Deployed HFC Assets
By Venk Mutalik, Marcel Schemmann, Zoran Maricevic, and John Ulm, ARRIS Group
|
2015 |
Unleashing Fiber Capacity by Jointly Optimizing D3.1 and RFoG Parameters
By Venk Mutalik & Brent Arnold Benny Lewandowski, ARRIS; Phil Miguelez, Comcast; Mike Cooper, Cox
|
2017 |
Network Migration Demystified In The DOCSIS 3.1 Era And Beyond
By Ayham Al-Banna, Tom Cloonan, and Frank O’Keeffe, ARRIS, and Dennis Steiger, nbn
|
2016 |
A Side-By-Side Comparison Of Centralized vs. Distributed Access Architectures
By Michael J. Emmendorfer, Thomas J. Cloonan, John Ulm, and Zoran Maricevic, ARRIS
|
2014 |
DOCSIS 4.0: A Key Ingredient of the 2030's Broadband Pie
By Zoran Maricevic, Ph.D., Tom Cloonan, Ph.D. & John Ulm, CommScope; James Andis, HFC Technologies
|
2021 |
Lessons From Telco & Wireless Providers: Extending The Life Of The HFC Plant With New Technologies
By Tom Cloonan, Ayham Al-Banna, Mike Emmendorfer,
Zoran Maricevic, Frank O’Keeffe, and John Ulm,
ARRIS Group, Inc.
|
2015 |
Virtual Fiber – 100 Gbps over Coax
By Steven Krapp, MaxLinear, Inc
|
2017 |
Broadband Capacity Growth Models - Will the end of Exponential Growth eliminate the need for DOCSIS 4.0?
By John Ulm, Zoran Maricevic, Ph.D., Ram Ranganathan; CommScope
|
2022 |
Using DOCSIS To Meet The Larger Bandwidth Demand Of The
By Tom Cloonan, Ayham Al-Banna, and Frank O’Keeffe, ARRIS
|
2016 |
Measurement-Based EOL Stochastic Analysis And DOCSIS 3.1 Spectral Gain
By Ayham Al-Banna, David Bowler, and Xinfa Ma, ARRIS Group, Inc.
|
2015 |
Preparations for Deploying & Lessons Learned from Deploying High Split (204 MHz) on I-CCAP, R-PHY, & R-MACPHY - High Split as a Steppingstone Towards DOCSIS® 4.0
By Craig Coogan, CommScope, Inc.; Jamie Brown, Shaw Communications, Inc.; Zoran Maricevic, Ph. D., CommScope, Inc.
|
2022 |
A Comparison Of Centralized vs. Distributed Access Architechtures for PON
By Michael Emmendorfer and Sebnem ZorluOzer,
ARRIS
|
2016 |
Examining The Future Evolution Of The Access Network
By Michael J. Emmendorfer and Tom Cloonan, ARRIS
|
2013 |
Is Unity Gain Still the #1 Objective?
By John Ulm, Dr. Zoran Maricevic & Dr. Frank O’Keeffe, CommScope
|
2020 |
Next Generation - Cable Access Network
By M. Emmendorfer, S. Shupe, D. Cummings, T. Cloonan Contributors: Z. Maricevic, M.
Schemmann, B. Dawson, V. Mutalik, J.Howe, A. Al-Banna,and F. O'Keeffe, ARRIS
|
2011 |
DOCSIS 3.1 Downstream Early Lessons Learned
By John J. Downey, Cisco Systems Inc.
|
2017 |
An Economic Analysis Of Brownfield Migration CTTH vs. FTTH
By Michael Emmendorfer, ARRIS
|
2016 |
Leveraging DOCSIS® 4.0 CM Backward Compatibility on DOCSIS 3.1 Networks
By Karthik Sundaresan, Cable Television Laboratories Inc.; Doug Jones, Cable Television Laboratories Inc.
|
2023 |